Join us on one of the UK’s most significant infrastructure projects – Sizewell C. The Geotechnical Sub-Alliance (GSA) plays a vital role in preparing the ground for construction, using advanced techniques such as piling, diaphragm walling, soil mixing, and grouting. This is your opportunity to be part of a collaborative team delivering safe, efficient, and high-quality results.
Bachy Soletanche are currently recruiting for a Quantity Surveyor, to join our Ipswich and Leiston based team on one of the most significant infrastructure projects in the UK.
About the role:
Working as part of our Projects division, the Quantity Surveyor will be a key point of contact within the Commercial Team and will be part of a collaborative alliance delivering safe, efficient, and high-quality results.
Key Responsibilities
What We’re Looking For
It would be a bonus if you have:
Rencontrez Gwendal STUM, Conducteur Travaux 1
Rencontrez Romain, Directeur Travaux
Ces entreprises recrutent aussi au poste de “Construction Management”.