To provide engineering & design solutions from work winning concept phase to practical completion of projects with the common goal to win projects and to increase site net margin.
Key Tasks & Responsibilities:
- Deliver competitive designs (wholistic rather than simply pile element).
- Ensure design efficiency and buildability. Take full accountability for creating designs that are not only efficient but also practical and buildable, with input from collaboration with the operational teams.
- Provide technical and design support to all BSL departments and be fully integrated to the estimating teams and operational teams to aid their performance.
- Responsible for cage standardisation with the approval of the PM (cost).
- Provide controlled pile schedules tailored to site.
- Responsible for the production of fabrication drawings including temporary works/ lifting points in the cages.
- Leading, checking, and approving fabrication drawings from cage suppliers.
- Responsible for the production of the method drawings (cage installation, central bar installation, etc...).
- Ensuring method drawings are understood by key people onsite (work manager pm supervisor).
- Responsible for the production of the PTP and WTP drawings.
- Analyse the project input in order to interrogate it, reach an agreement and integrated in a design solution.
- Design on performance-based approach, observational approach rather than compliance approach.
- Contribute to deliver technical handover to operational teams. Define pre-agreed mitigations (anticipation vs reaction).
- Attend external meetings with Clients.
- Manage internal and external clients’ expectations.
- Embrace, promote positively and meet KPI set out by the Engineering Manager.
- Contribute to the continued improvement of the Engineering process within the department.
- Share ideas with Design and Engineering colleagues and to a certain extent broader organisation members.
- Conduct benchmarking studies to determine best practices/designs and future trends.
- Engage and receive feedback from estimating teams and operational teams for the purpose of continuous improvement.
Physical Working Environment:
Regular trip between sites, main offices and plant yard will be required to fulfil the role.