Configuration Engineer
Role Reference: JP00002874
Location: Aztec West Business Park, Bristol
Travel: Occasional Travel to site or SDC in Bridgewater (max 4 time per year)
Arrangement: Permanent
NUVIA UK's Technical Services & Consulting department is fast growing with hybrid opportunities available up and down the country. We're striving to create a multidisciplinary team to offer our clients the best range of talent.
BPSS clearance will be required at basic level. Prior clearance will not be transferrable.
Job Purpose / Overview
To provide professional, high quality engineering support to the HPC Project on behalf of the Plant Integration Function of the NNB Engineering Directorate and to ensure that the proposed design is compliant with UK regulations and context.
Contextual Information
EDF has an established UK-based New Nuclear Build team (NNB Genco) developing EDF’s interests in new nuclear in the UK. EDF’s ambition is to construct and operate two new EPR’s at Hinkley Point in Somerset. Each plant will cost several billion pounds to construct and at the operating stage will employ several hundred people.
The Plant Integration team is responsible for ensuring the configuration and control of the HPC Nuclear Power Plant design to underpin the timely and effective delivery of the overall project schedule. It assists with progressing aspects such as consistent design compliant to a set of agreed requirements and consistently implemented in the physical installation (also known as the “as build” configuration)
This role requires high levels of technical and organisational skills along with the ability to build strong working relationships with a variety of internal and external stakeholders.
The post holder will demonstrate;
Principal Accountabilities
The primary responsibility of the role of Configuration Engineer is to support the Technical Integration Branch of Plant Integration in coordinating HPC's activities within the Configuration Management processes. This will involve providing technical assistance and managing activities so that the Configuration Management processes owned by Plant Integration are properly, adequately and efficiently implemented across the project.
The main scope is as follow:
In addition, the post-holder may be required to perform other tasks relevant for the project or to the personal development of the post holder.
Knowledge, Skills, Qualifications & Experience
Technical Competencies